Category Archives: Chiller Technology

2 Torr showing on a gauge during process chiller vacuum service

Process Chiller Vacuum Service

During a recent process chiller vacuum service, our engineer achieved a deep vacuum of 2 Torr. This is the same pressure as if the Torr gauge had been fitted directly to the vacuum pump.

Torr Gauge

The Torr gauge was fitted to a refrigerant hose. The refrigerant system uses a different kind of fitting used for breaking in. Therefore, an adaptor fitting was used to go between the two kinds of fitting. A specialist sealant was used between the adaptor fitting and the refrigerant system and another sealant was used between the adaptor fitting and the refrigerant hose. This completed, the Torr gauge was located in a convenient location for inspection on achieving a deep vacuum.

0161 370 7193

service@maximuschillers.com

Contact Form

Process Chiller Vacuum Service Pump

Each of our engineers is issued with a high capacity 10cfm pump which is used for process chiller vacuum service. Only the best equipment will do at Maximus Chillers. The oil was changed as per standard industry procedures and the correct level of oil was checked. The vacuum pump was ran up to operating temperature for half an hour with the inlet valve closed. This was to ensure the correct operating temperature of the oil was achieved before load was given to the vacuum pump. A steel braided refrigerant hose with bolted ends fits with the service ports on the refrigerant system. Therefore, adaptor fittings were again used to get between this hose and the vacuum pump.

Dehydration Process

The purpose for evacuation is the removal of moisture from the refrigerant system. Air contains usually around 50% relative humidity of moisture carried within it. Air had ingressed into the system during the works that had been carried out.

Pressure Temperature Relationship of Water

The boiling point of water is 100°C at 760 Torr (1 bar absolute) this is Earth’s air pressure at sea level. This boiling point drops, corresponding to temperature and pressure until at 15°C the boiling point of water is 10 Torr. The boiling point of water at 0°C is 5 Torr. Therefore, with our vacuum pump achieving 2 Torr, a dry system is capable of being achieved regardless of the UK ambient temperature. Also, various heaters were used to speed up the process. Eventually the pressure in the refrigerant system was recorded at 2 Torr.

Related Blogs:
Chilling Plant Service

Global Chilled Water System Service

Chilled Water System EEV Service

Water System Service of Evaporator

Chiller Service of Fan Decks

HFC Chiller Service

Read more about the unit of pressure Torr on Wikipedia | Click Here


An engineer filling blue oil drums during industrial chiller maintenance

Industrial Chiller Maintenance

Industrial Chiller Oil Maintenance

On a recent Major maintenance visit to an industrial chiller, the scheduled oil change was carried out. The required oil being selected by our oil analysis process to the correct viscosity for a Grasso screw compressor operating at a 1° saturation.

Oil Drain Out

The oil separator and oil system was valved off from the rest of the system. The standing pressure of the vapour in the vessel was 5.8 bar. On the far end of the oil cooler is located an oil drain port, this is because it is the lowest part of the system. Using hoses and a valve, the oil was drained into empty oil drums.

Oil Pump In

Our engineer removed the old oil for recycling, then lifted the new oil to the work location. He used his portable oil pump to pump back in 4 drums of oil using the same port from which the oil was drained. This is so that the oil cooler, on the other side of a heat activated three way valve, was primed. The oil came to the correct level on the oil sight glasses and the vapour was bled from the oil filter so that the compressor was primed with oil. When the system starts, the discharge pressure in the oil separator pushes the oil into the suction of the screw.

0161 370 7193

service@maximuschillers.com

Contact Form

Slide Valve Oil Pump

To operate the slide valve, a gear type oil pump is bolted to the casting next to the shaft. This raises the oil pressure to 5 bar above discharge. The oil is pumped through channels in the casting to operate the slide valve. A spring is fitted to the slide valve to return it to 0% when the plant shuts down.

Industrial Chiller Maintenance Monitoring

The oil heater was switched on until the oil was 46°. The chiller was then started and run tested. The Delta P across the oil filter was found to be nominal at 0.5 bar. The oil level remained at the correct level as the three way valve opened to the oil cooler. The oil cooler, in turn being cooled by a cooling loop which uses some of the tubes on the air cooled condenser

Related Blogs:
Air Cooled Chiller Planned Maintenance

Water Chiller Maintenance

Process Chiller Maintenance Visit

Chilled Water System Maintenance

Air Cooled Chiller Maintenance

Follow this link to read about polyolester oil on Wikipedia | Click Here

 


Green Bitzer compressor being vacuumed during HFC chiller service

HFC Chiller Service

The HFC chiller being serviced in the photo is 600kw. It consists of two systems with a large Bitzer compressor for each system. It has a bespoke Micro Control System front end to run the machine and stop it should there be a fault condition. The chiller had been reported by the customer to have tripped out on a low pressure fault.

HFC Chiller Diagnosis Service

The readings of superheat and subcooling are available in the controller of the HFC chiller being serviced. This removes the need to fit instrumentation carried by our engineers. The process of diagnosis was therefore speeded up. The result being that the chiller was found to be running short of refrigerant.

Return Visit to Decant the Refrigerant

A Quote was submitted to the customer for approval. Once the Order was raised, a convenient time was arranged to return to site and carry out the HFC chiller service. The remaining charge of refrigerant was decanted into our recovery vessels with one of our fast pump out units which are carried by each of our engineers.

0161 370 7193

service@maximuschillers.com

Contact Form

Looking Around the Pipework for a Leak

Nitrogen, an inert gas, was introduced into the system to assist in the location of the leak. The leak was quickly found on one of the end turns of the condenser.

Brazing and Pressure Testing

Our engineer made good the leak using his brazing torch. Then, the integrity of the system was proven to industry standards with a system pressure test.

The Evacuation Process for HFC Chiller Service

The picture shows a 10 cfm (cubic feet per minute) vacuum pump being used to dehydrate the system during HFC chiller service. Each of our engineers carries a vacuum pump of this capacity as it speeds up the process. One refrigerant hose being fitted to the discharge pipe and another, smaller hose being fitted to the suction pipe. The system being vacuumed to a deep vacuum.

Recharge and Run Testing

After the chiller had been recharged with some of the charge of the refrigerant R134a, the remaining refrigerant was charged in its liquid phase, away from the compressor, until the superheat and subcooling values were within industry limits. A large amount of load was available as the chiller feeds an air blown film plastic manufacturing facility.

Related Blogs:
Chilling Plant Service

Global Chilled Water System Service

Chilled Water System EEV Service

Water System Service of Evaporator

Chiller Service of Fan Decks

Process Chiller Service

Read more about a film blowing machine on Wikipedia | Click Here


Engineer carrying out process chiller service with yellow and black cylinder

Process Chiller Service

Maximus Chillers has just carried out process chiller service to a flooded evaporator. The refrigerant seal on a four bolt, flanged coupling had been found to be leaking liquid refrigerant. There was no possibility to valve off that section of the machine, as the flooded evaporator is the storage vessel for all of the charge of the system in its liquid phase.

Refrigerant Decant for Process Chiller Service

Our high capacity pump out unit was set up next to the machine to carry out process chiller service. 55 kg of refrigerant was recovered in a short time into our recovery cylinder. This refrigerant was collected for recycling after the job was completed.

Process Chiller Refrigerant Leak Service

The flanged coupling was unbolted and the failed refrigerant seal was removed. The new seal was fitted from our full range of sizes that we keep on the shelf in our stores. Our engineer bolted the flanged coupling back up to the correct torque setting.

Pressure Leak Test

A nitrogen pressure leak test was carried out to ensure the integrity of the system with the result being a pass.

Dehydration Process

As the system was open to atmosphere, air had got into the system which carries moisture content. The moisture and non condensables were removed down to a near perfect vacuum using one of our high capacity vacuum pumps.

0161 370 7193

service@maximuschillers.com

Contact Form

Charging of Refrigerant

The photo shows the charging of a cylinder of refrigerant into the system in its liquid phase. The cylinder has a dip tube fitted for ease of cylinder handling. Once the pressure in the system and the cylinder equalized, remaining refrigerant was drawn into the system during the operation of the plant.

Run Testing

The sight glasses and level glasses were found to be at the optimum level under the normal running conditions of the process chiller. As it is a flooded system, there was found to be a low superheat value. A high subcooling value was achieved with the use of a subcooler. Our engineer monitored a full cycle of an hour and a half: compressor temperatures and oil level were found to be within normal operating limits.

Remote Service Monitoring of Process Chiller

The service of this process chiller can be remotely monitored via a data uplink through the internet. Our office continued to monitor the plant for some days as it went into seamless operation.

Related Blogs:
Chilling Plant Service

Global Chilled Water System Service

Chilled Water System EEV Service

Water System Service of Evaporator

Chiller Service of Fan Decks

HFC Chiller Service

Follow this link to purchase BESA pressure testing technical bulletin | Click Here


Two dark green centrifugal chillers undergoing maintenance in plant room

Centrifugal Chiller Maintenance

At the beginning of the year we completed centrifugal chiller maintenance for one of our customers in America. A last overseas trip for the moment given the current world lockdown. The chillers in the photo chill water that is pumped around a university campus.

Centrifugal Chiller Maintenance of Redundant System

The plant has been designed according to the N+1 principle: N being the amount of cooling required and 1 being that same amount of cooling again. Each chiller has enough capacity to satisfy demand. Given the large size of the campus, this principle was critical to keeping the University functioning should system failure occur. The chiller on the right was the lead chiller on arrival. After taking detailed readings during the maintenance, our engineer switched that chiller over into being the lag chiller and took readings from the chiller on the left. He rotates the lead/ lag of the chillers on each visit to balance the run hours of the compressors.

Volumetric Efficiency

Centrifugal chillers have a lower volumetric efficiency compared with positive displacement compressors such as screws and repips. This is because the impeller does not mechanically compress the refrigerant like a piston in a reciprocating compressor. This kind of compressor relies on centrifugal force to spin the refrigerant off the tip of the impeller and onto the next stage. The refrigerant is then discharged from the compressor.

0161 370 7193

service@maximuschillers.com

Contact Form

Mass Flow Rate

The above is more than compensated for with a high mass flow rate. That is to say: a high volume of refrigerant circulates around the system at its operating density. A large capacity machine is cost effective when considering energy efficiency and centrifugal chiller maintenance costs.

Gantry Crane for Centrifugal Chiller Maintenance

The gantry crane in the picture is available to aid with the lift and shift of the compressor, should compressor failure occur. Maximus Chillers are specialists in the overhaul of centrifugal compressors. We can arrange the lift out, transportation, strip down and reassembly of your compressors. All of our strip downs come with a 12 month warranty to give you peace of mind and confidence in our ability.

Related Blogs:
Air Cooled Chiller Planned Maintenance

Water Chiller Maintenance

Process Chiller Maintenance Visit

Chilled Water System Maintenance

Air Cooled Chiller Maintenance

Industrial Chiller Maintenance

Follow this link to read about centrifugal compressors at The Engineering Mindset | Click Here


Air cooled chiller planned maintenance showing both economizers with solenoid valves and expansion valves

Air Cooled Chiller Planned Maintenance

An air cooled chiller planned maintenance visit for a long standing customer of ours. They have just signed up to another 3 year contract. We know at Maximus Chillers that if we want to keep our customers, we must continue to offer the Maximus Service. Maximus is Latin for the highest and the greatest.

Planned Maintenance for Air Cooled Chillers

Planned maintenance is essential for these air cooled chillers as they are critical plant. They feed a large conference room which is a major part of the end user’s business. They can’t afford to loose the conference room when there is an event on. There is redundancy in the plant, but the customer always makes sure that the issues highlighted on the planned maintenance are acted on promptly. Also, the chillers feed a water cooled condenser for a pack which cools £50,000 of products used during the conferences.

Air Cooled Chiller Oil Planned Maintenance

1mw of cooling across 2 air cooled chillers were undergoing planned maintenance. Our engineer noticed that the oil level was slightly below the sight glass on one of the 250kw Bitzer compressors. The machine had previously been extensively run tested to ensure no oil return issues were present. Therefore, he decided to adjust the level with the oil available onsite.

0161 370 7193

service@maximuschillers.com

Contact Form

Economiser

The economisers, in the picture, were tested to ensure the solenoids were opening when the program sent the run signal. The electronic expansion valves functioned correctly and subcooled the liquid further after the condenser.

Head Pressure Control

The head pressure control was functioning correctly, keeping a steady 8 bar of pressure across all stages of loading and water system temperatures. This is because these chillers use a fan speed controller for each system. The fans cut in at the minimum running speed, which prevents stalling and over heating. Also, all fans running together are more reliable. Fans fail on systems using relays or pressure switches as the higher pressure fans don’t often come on. When they do, moisture has ingressed into them causing them to fail.

Related Blogs:
R134a Chilling Plant Maintenance

Water Chiller Maintenance

Process Chiller Maintenance Visit

Chilled Water System Maintenance

Air Cooled Chiller Maintenance

Centrifugal Chiller Maintenance

Industrial Chiller Maintenance

Follow this link to read more | Carel cut phase speed controllers


Yellow oil drums, ammonia refrigerant cylinders and flammable flushing agent of chiller refurbishment supplier

Chiller Refurbishment Supplier

Maximus Chillers is an established chiller refurbishment supplier. Maximus means the highest and the greatest in Latin, so we pride ourselves in offering the highest and the greatest customer service and technical capability. There is never a job too big for Maximus Chillers- we are seasoned in following a problem through to the logical solution.

Chiller Refurbishment Supplier

Parts

Any part is available to our contract customers. We have a worldwide supply chain of the best suppliers. This means any part or refrigerant can be sourced at your convenience. When a part is not available, a different part of the same design specifications is selected and usually delivered same day. By same day we mean: the part is loaded into a van- then and there- and driven to site!

Oil and Refrigerant

We keep a stock of oil, refrigerant and other materials in our stores- see picture. This provides you with 'round the corner' convenience to your factory or facility. Whatever kind of ammonia grade specialist oil you require- we have it on the shelf. With a comprehensive range of other chemicals and solvents- Maximus Chillers completes the picture.

0161 370 7193

service@maximuschillers.com

Contact Form

Chiller Refurbishment Fault Finding

Our engineers are in their comfort zone while carrying out fault finding during chiller refurbishment- that is what they do best! Even when a fault involves wiring that disappears into a loom, down the other end of the machine, with no wiring diagram- Maximus Chillers can help. Usually, however, faults are obvious to our engineers or can be found easily.

Technical Support Desk

Our contract customers enjoy the full benefit of our global technical support desk. We offer real time technical support with manuals being sent electronically to site. Where a time difference is involved, we arrange a time convenient to both locations, or answer emails when the office opens in the morning. If we can talk you through over the phone, we can get you up and running with the minimal disruption to your process.

Related Blogs:
Chiller Refurbishment Company

Chiller Condenser Retrofitting

Visit the ASHRAE for Standards and Guidelines Under Continuous Maintenance


Process chiller maintenance visit showing refrigerant gauge lines fitted to a grey chiller

Process Chiller Maintenance Visit

Maximus Chillers recently carried out a maintenance visit to an Italian process chiller.

Process Chiller Maintenance Visit for Water Level Sensor

The process chiller has a water treatment schedule, but on this visit, the water level sensor needed maintenance. This is because the three probes of the sensor were not completing continuity. The probes complete the continuity from the wire going into the sensor, along the probe, then to another wire completing continuity back to the controls of the chiller.

Low Water Probe

If the controls loose continuity to the low water probe, the alarm is triggered and a call out is arranged to resolve the issue.

Correct Level Probe

In normal operation, the correct level probe is activated and the chiller runs as normal.

High Water Level Probe

Should the high water level probe be activated, again the alarm is triggered and a call out arranged.

0161 370 7193

service@maximuschillers.com

Contact Form

Maintenance Visit to the Process Chiller

As we were already on site to carry out the maintenance, there was no need to arrange a call out. We soaked the sensor for an hour in a special a decontamination chemical that has been designed to restore the probes. That done, the rest of the maintenance was carried out including the tightening of the wiring and motor connectors. It was possible to do this on this visit as the factory was not in production.

Run Testing

All readings around the chiller were taken when the factory went back into production. We found the fridge system to be working with optimum efficiency, meaning that the chiller will use the optimum amount of electricity. Efficiency is a great concern to a factory as they want to reduce their carbon footprint as much as possible.

Related Blogs:
R134a Chilling Plant Maintenance

Water Chiller Maintenance

Air Cooled Chiller Planned Maintenance

Chilled Water System Maintenance

Air Cooled Chiller Maintenance

Centrifugal Chiller Maintenance

Industrial Chiller Maintenance

Follow this link for the IOR celebration of chiller service engineers | Click Here


A chiller condenser retrofitting lifting operation outside in the compound

Chiller Condenser Retrofitting

We recently undertook the job to carry out bespoke chiller condenser retrofitting in the North West.

Rusted and Corroded Condenser

The old condenser looked alright on the surface- the fins were in good condition. The chiller condenser was 18 years old and when an attempt to repair a leak was carried out- the condenser leaked further along. This is because of the warming of rusted and corroded copper with an oxy-acetylene torch.

Chiller Condenser Retrofitting

We arrived on site to measure up for the job. The ‘V’ chiller condenser being retrofitted was built to order. We manufactured an exact replica to the same specifications and sizes of the old one. The operating pressures and high pressure cut out limit were taken into account in the design and the use of materials.

0161 370 7193

service@maximuschillers.com

Contact Form

Lift Out of Chiller Condenser being Retrofitted

On the day of the lift and shift we isolated the panel and checked it was dead, then we removed the panel and laid it on it’s front. This was to access the rivets behind the panel. These rivets, the ones on the other end of the chiller and around the lid were removed using a tool. The fans were disconnected and removed to make the lid lighter to lift off. Then, we attached slings to the chiller condenser and lifted both halves of the 'V' out.

Lift In of the Chiller Condenser being Retrofitted

This part we did not want to get wrong as the chiller condenser being retrofitted was brand new and did not have a mark on it. A reverse of the removal- it fitted perfectly just the same as the old one. With the lid lifted back on and the fans in- time for brazing then the pressure test.

Pressure Test, Dehydration and Recharge

The pressure test was satisfactory so our engineer put the system on vac for dehydration purposes and the removal of non condensables. After a deep vacuum was achieved the system was recharged and run tested. No issues were found.

Related Blogs:
Chiller Refurbishment Supplier

Chiller Refurbishment Company

Read more about air cooled condensers at the Institute of Refrigeration Click Here


Chiller refurbishment company electronic components in electrical panel

Chiller Refurbishment Company

Choosing a chiller refurbishment company is cost effective because the main cost of a large chiller is mostly in the fixed plant. That is to say: the two main heat exchangers and the compressor. Therefore, this is the most environmentally friendly option as the carbon footprint of building new plant is very high. This is not mentioned when you purchase a new chiller. With chiller controls replacement, this kind of plant can last for 50 years. One of our competitors has been carrying this out to a chiller that dates back to the 1970s and is still in service!

Refurbishment of the Chiller Evaporator

Chiller refurbishment of broken tubes can be performed to beyond manufacturer's recommendations. Larger scale replacement of the tubes can be carried out giving the same lifespan of the original tubes. This is a major overhaul at a fraction of the cost of replacing the chiller.

0161 370 7193

service@maximuschillers.com

Contact Form

Refurbishment of the Chiller Compressor

We strip the chiller compressor down for refurbishment in our workshop. It is made from heavy castings so will last a very long time. We provide a 12 month warranty on all our chiller compressors. Read More about centrifugal compressor remanufacturing on our web page.

Refurbishing the Chiller Controls

Refurbishing the chiller controls can be carried out by fitting state of the art controls. The controls that come with the chiller are made 'in house' so they are often prone to spurious trip outs. These trip outs can cause a loss in production. A control panel, designed specifically for that chiller comes ready built. All you have to do, is wire in the various sensors and transducers. The run signal, compressor soft start, remote loading and monitoring can be easily integrated.

Chiller refurbishment Company: Maximus Chillers | National and Global.

Visit our Blog to read about:
Chiller Refurbishment Supplier

Chiller Condenser Retrofitting

Read more about the chiller controls we fit to existing chillers.


Translate