Packaged Chiller Service

Brazing equipment box and vibration eliminators during packaged chiller service

Packaged Chiller Service

Packaged chiller service due to a refrigerant leak, resulting in a trip out. This visit was to identify the leak and get the plant back online.

Leak Testing During Packaged Chiller Service

Nitrogen was added to the system to aid in the identification of the leak. All parts of the system were checked, including the removal of lagging around the couplings onto the evaporator. The leak was found on a poor quality ‘eliminator’ which had rubbed through on the evaporator.

Vibration Eliminators

We decided to fit high quality vibration eliminators- see picture. These are fitted one in the horizontal position and the other in the vertical. They absorb both directions of vibration then they are clamped to the chiller frame.

Brazing During Packaged Chiller Service

The pipework brazing was carried out during packaged chiller service with all combustible materials being removed from the work location. A permit to work was opened with our engineer as the responsible person. A half hour fire watch was carried out on completion of works.

0161 370 7193

service@maximuschillers.com

Contact Form

Pressure Test During Packaged Chiller Service

The pressure testing was carried out using nitrogen. As nitrogen is an inert gas, it will not cause other potential risks to the chiller and other personnel. The pressure test was a pass, so the next phase of the job could be carried out…

Vacuum Pump

Each engineer carries a 10 cfm vacuum pump. This high capacity ensures a fast vacuum. The Torr gauge was fitted to the system and 2 Torr was pulled.

Refrigerant Saturation

In the cylinder, the saturation of R407c is 7 bar at 11° The refrigerant in the cylinder is in its liquid phase with vapour on top.

Subcooling

On run testing the chiller, the subcooling value was found to be nominal at industry standard level.

Superheat

The superheat was adjusted, little by little, with the charging of the refrigerant until a good value was achieved. This was tested across all loading conditions for the rest of the visit.

Related Articles:
Chilling Plant Service

Global Chilled Water System Service

Chilled Water System EEV Service

Water System Service of Evaporator

Chiller Service of Fan Decks

HFC Chiller Service

Process Chiller Vacuum Service

Read more about reducing refrigerant leaks at the Institute of Refrigeration | Click Here


Green Bitzer compressor being vacuumed during HFC chiller service

HFC Chiller Service

The HFC chiller being serviced in the photo is 600kw. It consists of two systems with a large Bitzer compressor for each system. It has a bespoke Micro Control System front end to run the machine and stop it should there be a fault condition. The chiller had been reported by the customer to have tripped out on a low pressure fault.

HFC Chiller Diagnosis Service

The readings of superheat and subcooling are available in the controller of the HFC chiller being serviced. This removes the need to fit instrumentation carried by our engineers. The process of diagnosis was therefore speeded up. The result being that the chiller was found to be running short of refrigerant.

Return Visit to Decant the Refrigerant

A Quote was submitted to the customer for approval. Once the Order was raised, a convenient time was arranged to return to site and carry out the HFC chiller service. The remaining charge of refrigerant was decanted into our recovery vessels with one of our fast pump out units which are carried by each of our engineers.

0161 370 7193

service@maximuschillers.com

Contact Form

Looking Around the Pipework for a Leak

Nitrogen, an inert gas, was introduced into the system to assist in the location of the leak. The leak was quickly found on one of the end turns of the condenser.

Brazing and Pressure Testing

Our engineer made good the leak using his brazing torch. Then, the integrity of the system was proven to industry standards with a system pressure test.

The Evacuation Process for HFC Chiller Service

The picture shows a 10 cfm (cubic feet per minute) vacuum pump being used to dehydrate the system during HFC chiller service. Each of our engineers carries a vacuum pump of this capacity as it speeds up the process. One refrigerant hose being fitted to the discharge pipe and another, smaller hose being fitted to the suction pipe. The system being vacuumed to a deep vacuum.

Recharge and Run Testing

After the chiller had been recharged with some of the charge of the refrigerant R134a, the remaining refrigerant was charged in its liquid phase, away from the compressor, until the superheat and subcooling values were within industry limits. A large amount of load was available as the chiller feeds an air blown film plastic manufacturing facility.

Related Articles:
Chilling Plant Service

Global Chilled Water System Service

Chilled Water System EEV Service

Water System Service of Evaporator

Chiller Service of Fan Decks

Process Chiller Service

Process Chiller Vacuum Service