Chiller Service Company Visit

Large chiller, refrigerant cylinder, brazing equipment and tools during chiller service company visit

Chiller Service Company Visit

A typical rainy day in the North West, perfect for a chiller service company visit.

News Article No.11

Electrical Faults during Chiller Service Company Visit

This was a return visit to do a refrigerant leak, but the customer alerted our engineer’s attention to an electrical fault. System 2 was found to be locked out in fault on the recent maintenance visit, but now System 1 was being held off too. The fault message on the controller was High Pressure. The controller sends a 240v fault feedback signal, through the high pressure switch which returns to the controller. Our engineer had a look at the wiring diagram to find the number on the terminal strip and checked it out with his multimeter. As he suspected, there were volts going out, but not coming back. He removed the side panel for system 1 and found the switch on the discharge pipe. It was the type that has a red button on the top. When he pressed it, there was a click and volts returned to the controller.

Alarm Reset during Chiller Company Service Visit

He interrogated the Carel controller and followed the reset procedure. The controls went through a timer and then the start sequence was initiated.

Run Testing during Chiller Company Service Visit

After the first scroll compressor started, the head pressure started to build up, but the condenser fans did not start. The on board high pressure gauge carried on rising until the high pressure switch was tripped again.

Head Pressure Control

A transducer on the discharge is used by the controller to sense the pressure in the condenser. When our engineer looked for this in the controller, it was found to be reading wrong by a considerable amount. There is a facility to enter a password and recalibrate the transducer, but this only allows for a small adjustment.

Test Instrument

Our engineers carry various kinds of test instruments which can be used to give a temporary false reading to the controller. This gets the customer up and running and back in production whilst a new transducer is ordered and sent to site.

0161 370 7193

service@maximuschillers.com

Contact Form

Chiller Company Service Low Pressure Visit

Now on with the job to resolve the low pressure issue with the chiller.

Refrigerant Pump Out

Our engineer decanted the remaining refrigerant into a vessel using his recovery unit. He only got out 7kg of a charge of 36kg.

Leak Testing during Chiller Company Service Visit

We use nitrogen for the leak testing as it is an inert gas that will not cause problems with the refrigerant system. There was a sign of the leak in between the steel frame at the middle of the condenser and the condenser tubes. We always strip the chiller down and leak test the entire system though. This is so that the job does not end up going round in circles. At first the leak could not be found, so the pressure was built up in stages taking into account industry recommended guidelines for a chiller. Sure enough the leak was where it was suspected to be.

Brazing during Chiller Company Service Visit

The location of the leak was reported to the maintenance engineer onsite and a hot work permit obtained. The equipment we use is tested at regular intervals to be safe and in good working order. A half hour fire watch was stipulated in the permit, along with the removal of combustible materials from the work location. Correct PPE being donned, he brazed the leak to the required industry standards.

F-gas Pressure Test

A chiller has a different pressure test procedure to other systems, so our engineer built the pressure up according to industry standards, then recorded it on his pressure test certificate. After the required time had elapsed, he rechecked the readings which were found to be satisfactory.

Vac Pump

Each of our engineers carries a state of the art 10cfm vacuum pump to speed up the dehydration process. We use high quality Torr gauges too, so as to get an accurate pressure reading. A good read back was achieved at the end of the process.

Recharge and Run Test

After the refrigerant recharge was carried out, a satisfactory run test was achieved.

0161 370 7193

service@maximuschillers.com

Contact Form

Refrigerant Economizers

This particular chiller uses an economizer to further subcool the refrigerant. Chiller designers have worked out that the end user can save a considerable amount of money over 10 years if these components are used. After the subcooled liquid refrigerant leaves the condenser, it goes through a plate heat exchanger. Some of this refrigerant, however, is diverted through a thermostatic expansion valve, to the other side of this plate heat exchanger. Further subcooling occurring through the plates.

Expansion Valve

The refrigerant drops in pressure as it goes through the expansion valve. A bulb is fitted to the suction pipe on the outlet of the heat exchanger. The bulb has to be at the correct 'o clock position as oil insulation will affect the operation of the valve. A capillary tube connects the bulb to the valve. Inside the bulb, the same kind of refrigerant that is running in the system is present in its liquid state. As the temperature rises in the suction pipe, this refrigerant boils off, adding pressure into the capillary tube. This added pressure forces the power element down on the valve body and a needle forces the valve open.

Flash Gas

Imagine if the refrigerant was not subcooled at all. It would be around its saturation point with a lot of it flashing off into its vapour phase. Not good when you have warm water coming back from the process. The refrigerant would not absorb very much latent heat into the refrigerant system.

Efficiency

Imagine, on the other hand, the economizer which is fitted to this chiller. Now we have a good proportion of refrigerant in its liquid phase, on the low side of the system, with a minimum amount of flash gas. The warm process water has more chance to cool and the refrigerant absorbs a lot more latent heat. The chiller achieves set point easier and therefore saves a considerable amount of electricity. With this further subcooling monitored for a while, time for a signature from the customer and another job well done!

Related Articles:
Chilling Plant Service

Global Chilled Water System Service

Chilled Water System EEV Service

Water System Service of Evaporator

HFC Chiller Service

Process Chiller Vacuum Service

Chiller Breakdown

To read more about chiller electrical faults hit the Tag at the top of the page.

Read more about F-gas leak checking at Refcom | Click Here


Oil return solenoid removed during industrial chiller service

Industrial Chiller Service

On an industrial chiller service visit, the ammonia alarm was found to have been triggered.

News Article No.10

Industrial Chiller Service Faults

The onsite engineer had fault found the chiller and silenced the alarm, the yellow light was still flashing. The red light was lit on the panel and the red LED was illuminated on the ammonia alarm console. He had reported a smell of ammonia to us over the phone. This gave us a priority of getting to site, as many other alarms of this nature are often spurious. Our engineer attended site within an hour and confirmed that the fault finding was correct as described by the onsite engineer. The chiller is containerized in design as it is situated outside. All around the chiller are door panels for access to the various system components.

Breathing Apparatus and PPE

He donned his mask and full length ammonia resistant PPE before opening one of the panel doors. This was to ensure that he did not get overwhelmed by the refrigerant when he opened the door. He started with the door into the storage area of the containerized chiller. A strong blast of ammonia came out in his face- lucky for the PPE!

Localising the Fault

Working his way around the chiller, our engineer found more and more hazardous door openings! Eventually he found the culprit: one of the two flanges were leaking on the oil return solenoid. The refrigerant vapour was coming out in its usual white form. The oil return pipe feeds off the oil pot which is a chamber that the oil sinks into from the refrigerant economizer. This vessel was valved off and the other end of the pipe valved off too.

Pinpointing the Fault

Now that the ammonia refrigerant leak had started to calm down- it was possible to see through the white vapour to exactly which of the flanges was leaking. It was the right one as seen in the picture. It consists of an ‘o’ ring made of ammonia resistant rubber material.

0161 370 7193

service@maximuschillers.com

Contact Form

Industrial Chiller Service in Local

The above mentioned chiller runs in local in a lead/ lag configuration with the adjacent chiller. That is to say- there is no wire or modem to a remote location. A panel is available in between the two chillers to sequence the switch over between the two. When the chiller tripped out due to the fault, the other chiller was supposed to have been enabled. This did not happen, so our engineer investigated the situation. The sequencer panel sends out a 24v fault feedback signal to each chiller. This, in turn, goes through a relay and back to the sequencer panel if all is good. When a fault occurs, the volts drop out to the relay in the chiller and a relay drops out in the sequencer. When the relay drops out in the sequencer, a normally closed contact makes and brings a red light on. This was not happening, so our engineer followed it through with his multimeter. He found a blown 1 Amp control fuse in the chiller, he replaced it and it blew again. After some careful research he found that there was an earth leakage due to the ingress of water into a safety switch. This switch was nothing to do with the above, but it blew the whole control circuit. Having reinstated the fuse, he found that the panel switched over satisfactorily in local.

Advantages

This kind of operation method has an advantage in its simplicity. There are no complicated BMS systems for the chiller to be integrated into. A sequencer panel is easy to construct and maintain- keeping the costs down to the end user.

Disadvantages

The disadvantage of this kind of system is that the first thing the factory usually notices is that they are loosing the process. The water temperature getting too high is the first alarm signal. With this site, however, there is a permanent onsite engineer on hand. He is experienced with the first checks to carry out and can often get the plant running with no problem.

0161 370 7193

service@maximuschillers.com

Contact Form

Standing Pressure during Industrial Chiller Service

The standing pressure was taken into account on the return visit to fit the oil return solenoid valve seal. Because the valve is on the low side of the system, when the chiller is off, the pressure is higher than when it is on. Therefore, so long as the seal pressure tests to this pressure, then all will be good when the system is running. That is assuming that the valve seals work satisfactorily at a lower temperature range. There are issues sometimes when a seal will be okay at ambient temperature but will leak when it becomes brittle at a colder temperature. This happens usually on an old seal and, indeed, this condition can be tested for when run testing the system.

Leak Testing during Industrial Chiller Service

On fitting the seal, our engineer donned full length ammonia resistant PPE and breathing apparatus. A little at a time, he introduced refrigerant into the area of the valve seal. Any residual air being purged through a valve.

Pressure and Temperature

The standing pressure of refrigerant is affected by temperature. That is to say- that the higher the temperature- the higher the pressure. On the day this job was carried out, the ambient temperature was 12° C and using an app on his phone, he calculated that the pressure should be 5.6bar. This is consistent with Charles’ Law of Constant Volume with a coefficient added for this particular refrigerant. If the pressure had been higher than this, it would indicate the presence of air in the system. Daltons’ Law of Partial Pressures states that all gasses in a vessel will act as if they are on their own, therefore, causing a higher pressure.

Run Testing during Industrial Chiller Service

After the pressure was built up to full standing pressure and the seal held satisfactorily, the system was then run tested to ensure, as stated above, that the seal performed well across the full temperature range during the operation of the plant.

0161 370 7193

service@maximuschillers.com

Contact Form

Mass Flow Rate during Industrial Chiller Service

The mass of refrigerant passing, which is measured by the second.

Suction Density

In this case of the oil return valve seal, we are looking at the density of the low side refrigerant as it passes into the suction port of the compressor. The higher the pressure of the refrigerant, the more refrigerant there is- so it has a higher mass flow rate. This system has a refrigerant saturation point of 1° which corresponds to a pressure 3.4bar. That is a high mass flow rate for this kind of refrigerant. This is because this refrigerant is usually used in low temperature applications where the pressure of the refrigerant is below that of the atmosphere. In that condition, when a leak occurs on the low side of the system- air leaks in. Air bleed valves are available to remove this unwanted air from the system.

Compressor Loading

The bigger the compressor on a chiller- the higher the mass flow rate. Most compressors have loading solenoids, vanes or a slide valve to regulate this.

Piston Displacement

Reciprocating compressors use loading solenoids to increase piston displacement. Usually, oil from the oil pump holds the piston valves open and so preventing compression on that cylinder. When more flow rate is needed- the loading solenoid de energizes- the piston valves drop and the cylinder comes into action. Therefore, increasing the mass of refrigerant through the compressor.

Vanes

Vanes are used on centrifugal compressors to increase the flow of refrigerant through the compressor. An actuator linked to a chain is used to open the vanes. The controls work out the correct position of the vanes for a given load condition.

Slide Valve

The slide valve offers a seamless amount of loading, anywhere between 0% and 100% A slide valve potentiometer senses the position of the slide so that the controls can regulate the flow through the compressor. The screw compressor in this blog uses a slide valve- on full load with the slide at 100% all readings were taken with a good read back. Another job done- another happy customer!

Related Articles:
Chilling Plant Service

Global Chilled Water System Service

Chilled Water System EEV Service

Water System Service of Evaporator

HFC Chiller Service

Process Chiller Vacuum Service

Chiller Breakdown

Chiller Service Company Visit

To read more about chiller fault finding hit the Tag at the top of the page.

Read more about refrigerant mass flow rate at Science Direct | Click Here


400 kw white chillers with panels open during air cooled chiller maintenance

Air Cooled Chiller Maintenance

A nice day to carry out air cooled chiller maintenance at a new site we have taken over in the South East.

News Article No.6

Our engineer attended site at around 9am with the risk assessment method statement having been sent in advance. A site survey was carried out to see if there were any additional risks. Should there have been any changes- the RAMS have a section for the additional risks and control measures. After gaining a permit to work, our engineer was issued with a security pass to access the chiller compound. Three chillers are located in the compound which feed air handlers for a critical application. Two of the chillers are multiple system, scroll compressor, air cooled chillers. The other is a single system screw chiller.

Program Settings During Air Cooled Chiller Maintenance

A complete download of the program settings is available in our engineer’s phone. This is to cross reference the settings, should one of them be accidentally changed by the maintenance engineers. Onsite engineers are the first port of call for chiller trip outs, with the responsibility to get the plant up and running. We offer real time assistance, over the phone from our Technical Support Desk and can send user manuals in PDF form, direct to their computer. The settings were found to be nominal, so a detailed analysis of the alarm history was carried out:

Alarm History During Air Cooled Chiller Maintenance

In reverse date order, the alarm history of all the systems was interrogated. There had been several system shut downs to carry out the periodic maintenance by the onsite personnel. The electricity having been shut down, there was a subsequent oil pre heating timer in the history too. On Chiller 2, System 1 however, there had been several low pressure trip outs. Our engineer decided to start the maintenance with this system by carrying out a full diagnosis of the low side of the refrigerant system:

0161 370 7193

service@maximuschillers.com

Contact Form

Superheat During Air Cooled Chiller Maintenance

The system runs on R410a refrigerant. This refrigerant has higher operating pressures in comparison with other HFC refrigerants. It has an efficient temperature range which can be seen on a pressure enthalpy chart. Below or above this range- the refrigerant loses efficiency and so has a lower coefficient of performance. The most common saturation point for this refrigerant is 0° which corresponds to a 7 bar suction pressure in the evaporator. Above this is the superheat of the refrigerant returning to the compressor. On this occasion there was found to be 26° of superheat and a suction pressure of 4 bar- close to the low pressure trip out. After careful diagnosis, our engineer decided to focus his attention on the expansion valve:

Thermostatic Expansion Valve

There are 4 forces acting on a TEV:

Liquid line pressure coming from the condenser.
Versus
Suction pressure down the equalising line from the far side of the evaporator. This compensates for the pressure drop across the evaporator and shows the true compressor side pressure.

Spring pressure acting upwards and closing the valve.
Versus
Bulb pressure forcing the valve open.

To reduce the superheat, the bulb should have forced the valve open. The refrigerant charge in the bulb acts upon the bellows to achieve this. The reason for the malfunction, on this occasion, was found to be the failure of the expansion valve orifice. It had become jammed- causing a shortage of refrigerant in the evaporator/ high superheat.

Latent Heat

Our engineer was carrying out the above fault finding with one compressor running and the other two being held off. This was to prevent a low pressure trip. Where chillers are left running with a high superheat condition, the reduced amount of latent heat causes a higher cost in electricity relative to refrigeration effect (COP) The refrigerant carries on superheating without absorbing latent heat- pointless and inefficient for a chiller.

Chiller Pump Down

For convenience, this chiller can be pumped down and valved off using the service valves. The evaporator can be worked on after breaking in procedures are carried out. Therefore, we have arranged for this to be carried out before fitting the new expansion valve parts. These chillers also have the ability to pump down the refrigerant on receiving a fault feedback from the electronic leak detector. This is an added measure to lower the environmental impact of refrigerant leaks.

0161 370 7193

service@maximuschillers.com

Contact Form

Subcooling During Air Cooled Chiller Maintenance

Cooling the refrigerant vapour down, through the latent heat phase and then subcooling the liquid down further. On System 2 of the same chiller, a subcooling issue was identified. 21 bar/ 36° saturation was normal for that system as defined by the fan speed controller. Now, the system pressure was higher at 28 bar/ 47° saturation, so our engineer decided to work out the subcooling. A very high reading of subcooling was recorded at 28° this was diagnosed to be due to non condensables in the refrigerant:

System Non Condensables

Non condensables are gases that will not condense, such as, air and nitrogen. If nitrogen is not vented properly and a deep vacuum then achieved, the gasses will remain in the refrigerant system. When calculating the subcooling, the readings work out incorrectly due the presence of the gasses. This can lead to false diagnosis. The remedy for the issue was to arrange a full refrigerant decant, pressure testing and dehydration, before charging with new refrigerant.

Efficiency

Having good subcooling values on a refrigerant system is critical to efficiency. Where there is no subcooling- the refrigerant has not fully rejected all the latent heat from the condenser. This can be seen when looking at a PH chart and plotting the pressures and temperatures. This heat remains in the refrigerant and adds to the system along with heat added from the compressor and heat from the process. This is another reason the coefficient of performance is reduced and so incurring increasing electricity costs for the plant.

Economizer

These chillers are also fitted with refrigerant economizers- one for each system. They work by diverting some of the refrigerant from the condenser, through a small expansion valve, then through a plate heat exchanger. The rest of the liquid refrigerant passes on the other side of the plate heat exchanger and so is further subcooled.

Related Articles:
Air Cooled Chiller Planned Maintenance

Water Chiller Maintenance

Process Chiller Maintenance Visit

Chilled Water System Maintenance

Centrifugal Chiller Maintenance

Industrial Chiller Maintenance

Air Cooled Chiller Condenser Maintenance

Glycol Chiller Maintenance

Chiller Maintenance Company

Chilling Plant Maintenance

Preventative Chiller Maintenance

To read more about air cooled chiller maintenance hit the Tag at the top of the page.

For further reading on chilled water visit Wikipedia | Click Here


Yellow oil drums, ammonia refrigerant cylinders and flammable flushing agent of chiller parts supplier

Chiller Parts Supplier

Chiller Parts Supplier of Compressors

Centrifugal

As a chiller parts supplier, all kinds of centrifugal compressors are remanufactured in our workshop. With an over head gantry crane and specialist equipment to hand- Maximus Chillers completes the picture.

Screw

Screw compressors are remanufactured on the bench. With compressed air and bearing tools- our skilled screw compressor technicians are seasoned in high tolerance measurements.

Scroll

We have a range of off the shelf Copeland compressors for a fast lead time on process chiller repairs.

Chiller Parts Supplier of Condensers

Air Cooled

When the condenser on an air cooled chiller is in poor condition- our site survey team will attend to measure up for a new bespoke condenser.

Shell and Tube

This type of condenser is used on water cooled chillers.

Chiller Parts Supplier of Evaporators

Shell and Tube

This is the most popular type of evaporator for large chillers. The low temperature refrigerant is on the outside of the tubes in liquid form. The water is pumped through the tubes, releasing heat from the process into the refrigerant. This is latent heat as the liquid refrigerant boils off into a vapour.

0161 370 7193

service@maximuschillers.com

Contact Form

Chiller Parts Supplier

Vibration Eliminators

We have all the sizes of anacondas on the shelf in our stores. This saves on the delivery time to site when your process if off due to the chiller. Maximus Chillers will get you up and running- fast!

Flushing Agent

For when things go wrong… we stock a solvent based flushing agent which is blown through the system with nitrogen.

Refrigerant Economizers

These are another term for a subcooler. If the refrigerant is further subcooled after the condenser- the system will run more efficiently.

Chiller Parts Supplier of Controls

Pressure Transducers

We can make temporary repairs to faulty pressure transducers using our test equipment. This will keep your plant running while the part arrives onsite.

Chiller Parts Supplier of Ammonia and HFC refrigerant

A full selection of refrigerants are available in our stores including: anhydrous ammonia, R407c, R134a and R410a.

Chiller Parts Supplier of Compressor Oil

Low, medium and high viscosity oils in 5ltr cans and 20ltr drums are ready for shipping from our storage area.

Any Chiller- Any Problem- Any Part- Any Refrigerant- Anywhere- The MAXIMUS ADVANTAGE™

Related Articles:
Screw Chiller Compressor Maintenance

Chiller Compressors

Air Cooled Chiller Condenser Maintenance

Shell & Tube Evaporator Maintenance

Scroll Chiller Compressor Maintenance

To read more about chiller evaporators- click the Tag at the top of the page.

Read more about the centrifugal vapour compressor at the Institute of Refrigeration | Click Here


Air cooled chiller planned maintenance showing both economizers with solenoid valves and expansion valves

Air Cooled Chiller Planned Maintenance

An air cooled chiller planned maintenance visit for a long standing customer of ours. They have just signed up to another 3 year contract. We know at Maximus Chillers that if we want to keep our customers, we must continue to offer the Maximus Service. Maximus is Latin for the highest and the greatest.

Critical Air Cooled Chiller Planned Maintenance

Planned maintenance is essential for these chillers as they are critical plant. They feed a large conference room which is a major part of the end user’s business. They can’t afford to loose the conference room when there is an event on. There is redundancy in the plant, but the customer always makes sure that the issues highlighted on the planned maintenance are acted on promptly. Also, the chillers feed a water cooled condenser for a pack which cools £50,000 of products used during the conferences.

Air Cooled Chiller Oil Planned Maintenance

There is 1mw of cooling across the 2 chillers. Our engineer noticed that the oil level was slightly below the sight glass on one of the 250kw Bitzer compressors. The machine had previously been extensively run tested to ensure no oil return issues were present. Therefore, he decided to adjust the level with the oil available onsite.

0161 370 7193

service@maximuschillers.com

Contact Form

Economizer

The economizers, in the picture, were tested to ensure the solenoids were opening when the program sent the run signal. The electronic expansion valves functioned correctly and subcooled the liquid further after the condenser.

Head Pressure Control

The head pressure control was functioning correctly, keeping a steady 8 bar of pressure across all stages of loading and water system temperatures. This is because these chillers use a fan speed controller for each system. The fans cut in at the minimum running speed, which prevents stalling and over heating. Also, all fans running together are more reliable. Fans fail on systems using relays or pressure switches as the higher pressure fans don’t often come on. When they do, moisture has ingressed into them causing them to fail.

To read more about air cooled chiller maintenance click the Tag at the top of the page.

Related Articles:
R134a Chilling Plant Maintenance

Water Chiller Maintenance

Process Chiller Maintenance Visit

Chilled Water System Maintenance

Centrifugal Chiller Maintenance

Industrial Chiller Maintenance

Air Cooled Chiller Condenser Maintenance

Chiller Maintenance Checklist

Planned Preventative Chiller Maintenance

Chiller Maintenance Schedule

Air Cooled Chiller Maintenance

Chiller Maintenance Company

Chilling Plant Maintenance

Preventative Chiller Maintenance

Follow this link to read more | Carel cut phase speed controllers


Translate