by Maximus Chillers | Jun 14, 2020 | Chiller Technology
Packaged chiller service due to a refrigerant leak, resulting in a trip out. This visit was to identify the leak and get the plant back online. Leak Testing during Packaged Chiller Service Nitrogen was added to the system to aid in the identification of the leak. All...
by Maximus Chillers | Jun 8, 2020 | Chilling Plant
On this chilling plant maintenance visit, particular attention was made to compressor loading. This was to ensure that the compressors are capable of operating at 100%. With summer now here- we want the plant capable of running at full capacity. Controller Loading...
by Maximus Chillers | May 31, 2020 | Chiller Components
The photo is showing air cooled chiller condenser maintenance being carried out by Maximus Chillers. 6 water cooled chillers are located in the plant room below. They are 750 kw single screw compressors with a control panel located to the side of each. On this visit,...
by Maximus Chillers | May 25, 2020 | Chiller Technology
During a recent process chiller vacuum service, our engineer achieved a deep vacuum of 2 Torr. This is the same pressure as if the Torr gauge had been fitted directly to the vacuum pump. Torr Gauge The Torr gauge was fitted to a refrigerant hose. The refrigerant...
by Maximus Chillers | May 17, 2020 | Chilling Plant
Prior to this chilling plant controls maintenance visit, another contractor had changed some of the settings and adjustments in the controllers. They did this while they were diagnosing a fault with the water system and the pumps. Therefore, this visit was to...