by Maximus Chillers | Aug 4, 2019 | Ammonia Handling
The industrial refrigeration ammonia visit was at a site in Aberystwyth. We look after 2 ammonia chillers for a blue chip customer. They are 10 year old chillers that have been designed to need ongoing attention. Quite easy job as the faults they go into are...
by Maximus Chillers | Jul 21, 2019 | Chilled Water Systems
Chilled Water System Condenser Beyond Repair The repair of the condenser was required on this chilled water system because the previous company had been chasing leaks round in a circle. Therefore, the customer had decided to buy a new condenser. This was our first job...
by Maximus Chillers | Jun 17, 2019 | Overseas Customers
Moscow Visit Always good for our engineers to get out of the country to carry out global chilled water system service. He just had a little free time this visit to see Red Square and Saint Basil's Cathedral. Most of the visit was bogged down resolving issues....
by Maximus Chillers | Jun 1, 2019 | Chilled Water Systems
Flow Switch The chilled water system flow switch requires regular maintenance due to a to build up of contaminants on the sensor. Over time, slime accumulates giving false readings. The problem is relatively easy to sort out: a wipe with a cloth. Retrieving the Sensor...
by Maximus Chillers | May 23, 2019 | Chiller Technology
Chilled water system EEV service was being carried out because the mechanical parts had failed. This particular valve is prone to this fault. It is an OEM electronic expansion valve, so our technician found the voltage for the motor and found a similar part with the...