by Maximus Chillers | Nov 1, 2020 | Articles
A rainy day for a chiller breakdown for our engineer in the North West. News Article No.8 Electrical Faults during Chiller Breakdown Our customer called us out because he was having electrical faults with the chiller. The power supply to part of the panel had gone...
by Maximus Chillers | Oct 11, 2020 | Articles
Diagnosis of Chillers One of the most important parts of a chiller maintenance company is the diagnosis. If this is done wrong, the wrong parts are ordered and the return job goes wrong. News Article No.7 For us at Maximus Chillers, it is imperative that we get the...
by Maximus Chillers | Sep 27, 2020 | Articles
A nice day to carry out air cooled chiller maintenance at a new site we have taken over in the South East. News Article No.6 Our engineer attended site at around 9am with the risk assessment method statement having been sent in advance. A site survey was carried out...
by Maximus Chillers | Sep 25, 2020 | Articles
The chiller maintenance schedule in essence is as follows: What is the plant? According to the asset list for that particular contract. What are we going to do with it? The checks, procedures and diagnosis in the pursuit of the maintenance of the chillers. How often?...
by Maximus Chillers | Aug 30, 2020 | Articles
Electrical Testing A chiller service company can carry out electrical testing and diagnosis even when a wiring diagram is not available- our engineers can trace the wiring around a chiller. News Article No.3 Doing this often aids with the diagnosis even when there is...
by Maximus Chillers | Aug 16, 2020 | Articles
Featuring planned preventative chiller maintenance, which is part of a series of longer, in depth articles. News Article No.2 This time concentrating on the checks, adjustments and diagnosis our engineer carries out while on site. We can extend the life of your plant...